Jump to content

Pan

Member
  • Posts

    3
  • Joined

  • Last visited

Posts posted by Pan

  1. lore Name: Pan

    Rank: Junior Researcher

    Clearance Level: LCZ

    List of personnel involved in testing: MTF Explosives expert

    Level D personnel involved: 1

    SCP: 173

    Hypothesis: How long can a D-class stall 173 before it gets bored

    Observation: 20 minutes of the D-Class talking, and 173 Missing each neck snap. The D-class was eventually forcefully thrown out once I blinked.

    Visual Stimuli (Photos/videos):None.

    Errors and/or safety hazards: Medical Staff got in the way

    Conclusion:Still Hostile as ever.

×
×
  • Create New...